Lean Webinar Series:
Advanced Lean for Office &
Service
November 9, 2010

Company

LOGO
Webinar Content
How and when to use takt time to balance work.
How to approach the need for load leveling.
How cross-training and co-location is an essential
step in a transformation.
The vital role and responsibilities for process
owners.
How to achieve value stream alignment.
How to translate operational metrics into financial
terms.

© 2010 Karen Martin & Associates

2
Creating a Lean Enterprise

Initial Lean focus


Eliminate muda – Waste

Advanced Lean




Eliminate muri – Overburden (people or
equipment)
Eliminate mura – Uneveness

© 2010 Karen Martin & Associates

3
Your Instructor
 Early career as a scientist; migrated to
quality & operations design and
management in the mid-80’s.
 Launched Karen Martin & Associates in
1993.
 Specialize in Lean transformations in nonmanufacturing environments.
 Co-author of The Kaizen Event Planner;
co-developer of Metrics-Based Process
Mapping: An Excel-Based Solution.
 Instructor in University of California, San
Diego’s Lean Enterprise program.
© 2010 Karen Martin & Associates

Karen Martin,
Principal
Karen Martin &
Associates

4
Webinar Participants’ Experience
60
49%

50
39%

40

30
20
9%

10
3%

0
True Beginner

© 2010 Karen Martin & Associates

Basic
Understanding

Skilled

Highly Skilled
5
Value Stream Mapping Proficiency
60
48%

50
40

35%

30
20
10

12%
5%

0
Never created one
© 2010 Karen Martin & Associates

Just learning

Skilled

Highly skilled
6
Most Advanced Lean Tool(s)
None
Visual management
A3
Value stream mapping
5S
Kaizen events
Kanban

© 2010 Karen Martin & Associates

Layout/cells
Root cause analysis
Metrics-based process
mapping
Takt time
Critical-to-Quality Tree
PDCA and DMAIC

7
Building a Lean Enterprise

Process
Stabilization
Tools
Building a Lean Enterprise

FlowEnhancing
Tools
Building a Lean Enterprise
Multi-Functional Workers /
Cross-Training
Eases scheduling / more flexibility
Improves employee value to organization
Greater job satisfaction
Better problem-solving and decision-making
Required for one-piece flow or a pull system to
function properly
If work is segmented, rotate frequently enough
to keep skills and satisfaction up


Based on work volume and complexity

11
Building a Lean Enterprise
Problems with Poor Layout

Sales

Estimating

Design
Engineer

Materials

Purchasing

Scheduling

 Internal suppliers and customers are not connected



Difficult to solve problems
Difficulty innovating / sharing best practices

 Difficult to find work and track progress
13
Office Cell
Linking people and processes into the most efficient
combination to maximize value-added content while
minimizing waste.
Cross-functional

One piece flow


Balanced -- waste removed



Cross-trained team



Standard work



Staffed to meet demand
Forms

Shared files
In

Out

More efficient communication
Single point scheduling
14
Loan Processing Flow

1

Legend
Work-In-Process (WIP)

(Before)

Account
Executive
(AE)

Sequence Number

2

Account
Manager
(AM)

Underwriter
(UW)

Elevators
& Restrooms

4

UW

5

5

AE

6
Funder
(FD)

1
4
AE

2
AM

4

1

2
AM

4

3

Set-Up
(SU)

6
FD
Loan Processing Flow
(After)

Customer

Customer

Shared
Resource

1
AE

Elevators
& Restrooms

2
AM

2

1

AM

AE

2

3

2

1

AE

AM

Set-Up

AM

AE

5

4

3

4

5

FD

UW

Set-Up

UW

FD

Customer

Customer

1
Mortgage Application Process
Improvement Results

Metric

Before

After

Time to process a loan

5 Days

1.5 Days

Customer complaints

4/Loan

1/Loan

WIP

60 Loans

25 Loans

17
Building a Lean Enterprise
Pull Systems
A method of controlling the flow of work and/or
material by replenishing work/material only as it is
consumed
Types



One-Piece Flow
FIFO lanes (first-in-first-out)
 Visual system authorizing supplier to send next “order”
 Note: FIFO in and of itself is not a pull system



Kanban
 Visual card system authorizing supplier to replenish
stock/supplies/parts

If flow stops at a single point (no consumption),
everything upstream stops as well (no
replenishment)
19
Pull System Flow Diagram
Closed loop

Customer

RFQ

Verify
In
In
Complete
Completed
Enter info.
quote per Quote
Box
in QEF log Box Quote
QEF

Customer

Information Request

Document Flow
WIP Locations

© 2008 Karen Martin & Associates
Pull Systems Concepts
If a bottleneck occurs, everything
upstream must stop!
Resource re-allocation must occur.


Cross-trained workers are essential.

Highlights problems and makes corrective
action mandatory.

© 2008 Karen Martin & Associates
Pull System in Admin Processes
Step A

Step B

Step C

Step D

Color coded folders or cards  quick
status of WIP at each process step
Maximum number of visual indicators
between each process  full queue
indicates resources must be re-diverted
Monitor WIP at first process to estimate
current throughput time
© 2010 Karen Martin & Associates

Step E
Single Bin Kanban System
Cardboard
Divider

Kanban
Card

Place card on top of
parts immediately
under divider

(1)
Appropriate
Sized Bin
(kanban
quantity fits
into one bin)

(2)
(3)
Draw Line Inside Insert Cardboard
Pan at Order
Divider to Create
Point Level
Physical Barrier
Two-Bin Color-coded System
Tape Kanban
Do not replenish

Replenish
Before / After

Excessive inventory;
Unclear who is responsible for
management/replenishment

Controlled inventory;
Color-coding identifies who is
responsible for
management/replenishment

26
Building a Lean Enterprise
Creating a Lean Enterprise

Eliminate muda – Waste
Eliminate muri – Overburden (people or
equipment)
Eliminate mura – Uneveness

28
Unbalanced Work
20
18

Takt Time

Process Cycle Time

16

= 15 Min.

14
12
10
8
6
4
2
0
Order Entry Sales Review

Design

Estimating
29
Takt Time Application
German word being “pace” or “drumbeat”
Used for balancing work and reducing
bottlenecks (especially for high volume work)
Best when workers are dedicated to one type of
activity (even if for only a portion of the day)


Tough to use when workers are multi-tasked

Will vary based on heavier or lower demand
periods

30
Takt Time Example:
Continuous Production

Available work time
Takt time =

Customer demand

“Touch down”

480 minutes/day
Takt time =

45 new accounts

= 10.6 mins

Each process step must have a process time of
10 minutes or less to avoid development of a
backlog – OR more people to perform the task.
31
Balanced Work

Process Cycle Time

20
Takt Time
= 15 Min.

15

10

5

0
Order Entry &
Review

Standard
Design

Complex
Design

Estimating

32
Work Balancing Considerations
 Avoid creating excessively narrow scopes of
responsibility.
 “Production line” vs. one-stop-shop






Assess “between work item” mental setup (switching) required –
if redundant mental setup, consider one-stop-shop
Assess “within work item” mental setup (switching) required – if
too much, consider production line
Assess skill requirements – can one person easily do it all?

 Who’s job is it?


Be willing to challenge paradigms

 Segment the work when necessary

© 2010 Karen Martin & Associates

33
Use Work Segmentation in High
Variation Environments
Segment work based on process time needed to
complete the tasks (e.g. degree of complexity).
Cross-train workers to do all levels of
complexity.
Rotate staff from team to team frequently to
keep interest and skill level high.


Creates organizational flexibility

© 2010 Karen Martin & Associates

34
Task-level FTE Requirements

Process Time
# FTEs Required =

20 mins
# FTEs =

10 mins

Takt Time
2 FTEs required to
=
meet customer demand

35
Creating a Lean Enterprise

Eliminate muda – Waste
Eliminate muri – Overburden (people or
equipment)
Eliminate mura – Uneveness

36
Load Leveling
Three product types: A, B, C
Weekly customer demand: 12 A’s, 9 B’s, 3 C’s
Traditional Production Model


AAAAAAAAAAAA—BBBBBBBBB—CCC

Better


AAAA-BBB-C-AAAA-BBB-C-AAAA-BBB-C

Best


ACABABAB ACABABAB ACABABAB

© 2008 Karen Martin & Associates

37
Production Smoothing
(Heijunka)
Leveling of:
Volume of production


The same quantity is produced each “interval”
for each product family

Variety of production (product mix)


Every (high-volume) model is produced every
“interval”

© 2010 Karen Martin & Associates
Load Leveling Tips
 First seek the root cause!
 When external customers are creating unlevel incoming
load




We have much more influence over external customer behavior
than we think.
Incentives:
 Information – e.g. add peak times to ACD phone recordings
 Financial – provide discounts, etc. for making requests during certain
time periods – e.g. sunset dinner specials

 When sales team creates unlevel incoming load


Change commission period/schedule.

 When internal department creates unlevel load, find out
why and apply a countermeasure or incentive that works
for all.
© 2010 Karen Martin & Associates

39
Prerequisites to
Production Smoothing
1.
2.
3.
4.

Connect the processes where possible (cells)
Create pull
Create flow (balance the work)
Achieve predictability (level output produced
daily for the cell or the line)
5. Reduce work type changeover time
6. Increase number of changeovers per day so
can increase the number of each type of work
produced per day

© 2010 Karen Martin & Associates
41
Heijunka for the Office

42
43
Heijunka
Wheel

44
Lean Management

© 2010 Karen Martin & Associates

45
Process Ownership & Value
Stream Alignment
 Value Stream Champion / Manager




Sole individual responsible for the performance of an entire
value stream across multiple departments or divisions.
Often carry P & L responsibility.

 Process Owner


Sole individual responsible for the performance of a process
across many functions, regardless of the org chart.
 Ongoing monitoring
 Ongoing improvement

 Org chart management



Direct reporting lines for day-to-day operation
Dotted lines to subject matter/policy expertise.

© 2010 Karen Martin & Associates

46
Creating Lean Leaders & Culture
The improvement professional’s primary role is
to sell and teach.


Many leaders aren’t improvement savvy.
 Help them understand the process, the resources required,
etc. – answer Why? Why? Why?



Many individuals have been “burned” by previous
improvement approaches and are fearful in today’s
economy.
 Help them see what’s in it for them.



Most people – from leadership to frontlines – aren’t
proficient problem solvers.
 Teach them to fish.

© 2010 Karen Martin & Associates

47
Looking for Stuff: Time is Money
Organization with 1,500 employees



Earn average of $22 per hour
Work 250 days per year

Each employee spends an average of 10
minutes per day looking or waiting for stuff


Individual impact
 = 41.7 hours wasted time per year
 = 0ver a week of frustrating, unfulfilling, nonproductive time



Organizational impact
 = 62,550 hours of nonproductive time
 30 FTEs worth of wasted resources
 = $1.4 unnecessary direct expense per year

© 2010 Karen Martin & Associates

48
Translating Office/Service
Improvements into Financial Terms
(aka “Monetizing Results”)

© 2010 Karen Martin & Associates

49
Monetizing Results –
Expense Reduction Possibilities
 Payroll



Paid overtime
Attrition (if flat or losing market share)

 In-sourcing previously outsourced services
 Supplies (one-time gain when implementing kanban)
 Software licenses
 Shipping expenses
 Facility-related



Leases
Utilities

 Borrowing expenses (due to improved cash flow)

© 2010 Karen Martin & Associates

50
Monetizing Results –
Cost Avoidance Possibilities
Freed capacity / hiring expenses
Turnover reduction / hiring expenses
Regulatory fines
Not scrapping nonreturnable material/supplies
Not ordering duplicate material/supplies
Not having to borrow money (due to improved
cash flow)

© 2010 Karen Martin & Associates

51
Monetizing Results – Revenue Gains, Revenue
Loss Avoidance, and Profit Gains

Freed capacity




Ability to absorb additional work without additional
labor or equipment
New revenue streams

Revenue gains



Shorter time to market
Sales team fully functional more quickly

Market share gains
Retaining high risk (“jeopardy”) accounts

© 2010 Karen Martin & Associates

52
Monetizing Results –
Revenue Loss Possibilities
Reducing PT in T&M Environments


Overcome by market share gains & new revenue
streams

© 2010 Karen Martin & Associates

53
For Further Questions

7770 Regents Road #635
San Diego, CA 92122
858.677.6799
ksm@ksmartin.com
Free webinars and monthly newsletter:
www.ksmartin.com/subscribe
Connect with us:

54

More Related Content

What's hot

Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...TKMG, Inc.
 
Lead time takt time cycle time and throughput
Lead time takt time cycle time and throughputLead time takt time cycle time and throughput
Lead time takt time cycle time and throughputHpm India
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
How to implement lean - Executive overview
How to implement lean - Executive overviewHow to implement lean - Executive overview
How to implement lean - Executive overviewW3 Group Canada Inc.
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptxabdullahmohamed10900
 

What's hot (20)

Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Lead time takt time cycle time and throughput
Lead time takt time cycle time and throughputLead time takt time cycle time and throughput
Lead time takt time cycle time and throughput
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Jidoka by Operational Excellence Consulting
Jidoka by Operational Excellence ConsultingJidoka by Operational Excellence Consulting
Jidoka by Operational Excellence Consulting
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
How to implement lean - Executive overview
How to implement lean - Executive overviewHow to implement lean - Executive overview
How to implement lean - Executive overview
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
13 pull system
13 pull system13 pull system
13 pull system
 

Similar to Advanced Lean Strategies for Office & Service Environments

How to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapHow to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapMauricio Navarrete
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Lean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMLean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMProduct School
 
Redesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowRedesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowLean Enterprise Academy
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Simon Misiewicz
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsNon Stop Portals
 
Designing a to be process
Designing a to be processDesigning a to be process
Designing a to be processIhor Malytskyi
 
Improving the Business Processes
Improving the Business ProcessesImproving the Business Processes
Improving the Business Processesfmbabs49000
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006Omnex Inc.
 
ASUG Utilities Presentation
ASUG Utilities PresentationASUG Utilities Presentation
ASUG Utilities PresentationMichael Robinson
 

Similar to Advanced Lean Strategies for Office & Service Environments (20)

How to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapHow to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmap
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Lean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMLean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PM
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Business process re engineering
Business process re engineeringBusiness process re engineering
Business process re engineering
 
Redesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowRedesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for Flow
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work Enviroments
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Utils_Presentation_Richard U
Utils_Presentation_Richard UUtils_Presentation_Richard U
Utils_Presentation_Richard U
 
Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
The Lean Strategic Challenge
The Lean Strategic Challenge  The Lean Strategic Challenge
The Lean Strategic Challenge
 
Designing a to be process
Designing a to be processDesigning a to be process
Designing a to be process
 
Improving the Business Processes
Improving the Business ProcessesImproving the Business Processes
Improving the Business Processes
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 
ASUG Utilities Presentation
ASUG Utilities PresentationASUG Utilities Presentation
ASUG Utilities Presentation
 

More from TKMG, Inc.

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - YouTKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingTKMG, Inc.
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 

More from TKMG, Inc. (20)

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 

Recently uploaded

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressorselgieurope
 

Recently uploaded (20)

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressors
 

Advanced Lean Strategies for Office & Service Environments

  • 1. Lean Webinar Series: Advanced Lean for Office & Service November 9, 2010 Company LOGO
  • 2. Webinar Content How and when to use takt time to balance work. How to approach the need for load leveling. How cross-training and co-location is an essential step in a transformation. The vital role and responsibilities for process owners. How to achieve value stream alignment. How to translate operational metrics into financial terms. © 2010 Karen Martin & Associates 2
  • 3. Creating a Lean Enterprise Initial Lean focus  Eliminate muda – Waste Advanced Lean   Eliminate muri – Overburden (people or equipment) Eliminate mura – Uneveness © 2010 Karen Martin & Associates 3
  • 4. Your Instructor  Early career as a scientist; migrated to quality & operations design and management in the mid-80’s.  Launched Karen Martin & Associates in 1993.  Specialize in Lean transformations in nonmanufacturing environments.  Co-author of The Kaizen Event Planner; co-developer of Metrics-Based Process Mapping: An Excel-Based Solution.  Instructor in University of California, San Diego’s Lean Enterprise program. © 2010 Karen Martin & Associates Karen Martin, Principal Karen Martin & Associates 4
  • 5. Webinar Participants’ Experience 60 49% 50 39% 40 30 20 9% 10 3% 0 True Beginner © 2010 Karen Martin & Associates Basic Understanding Skilled Highly Skilled 5
  • 6. Value Stream Mapping Proficiency 60 48% 50 40 35% 30 20 10 12% 5% 0 Never created one © 2010 Karen Martin & Associates Just learning Skilled Highly skilled 6
  • 7. Most Advanced Lean Tool(s) None Visual management A3 Value stream mapping 5S Kaizen events Kanban © 2010 Karen Martin & Associates Layout/cells Root cause analysis Metrics-based process mapping Takt time Critical-to-Quality Tree PDCA and DMAIC 7
  • 8. Building a Lean Enterprise Process Stabilization Tools
  • 9. Building a Lean Enterprise FlowEnhancing Tools
  • 10. Building a Lean Enterprise
  • 11. Multi-Functional Workers / Cross-Training Eases scheduling / more flexibility Improves employee value to organization Greater job satisfaction Better problem-solving and decision-making Required for one-piece flow or a pull system to function properly If work is segmented, rotate frequently enough to keep skills and satisfaction up  Based on work volume and complexity 11
  • 12. Building a Lean Enterprise
  • 13. Problems with Poor Layout Sales Estimating Design Engineer Materials Purchasing Scheduling  Internal suppliers and customers are not connected   Difficult to solve problems Difficulty innovating / sharing best practices  Difficult to find work and track progress 13
  • 14. Office Cell Linking people and processes into the most efficient combination to maximize value-added content while minimizing waste. Cross-functional One piece flow  Balanced -- waste removed  Cross-trained team  Standard work  Staffed to meet demand Forms Shared files In Out More efficient communication Single point scheduling 14
  • 15. Loan Processing Flow 1 Legend Work-In-Process (WIP) (Before) Account Executive (AE) Sequence Number 2 Account Manager (AM) Underwriter (UW) Elevators & Restrooms 4 UW 5 5 AE 6 Funder (FD) 1 4 AE 2 AM 4 1 2 AM 4 3 Set-Up (SU) 6 FD
  • 16. Loan Processing Flow (After) Customer Customer Shared Resource 1 AE Elevators & Restrooms 2 AM 2 1 AM AE 2 3 2 1 AE AM Set-Up AM AE 5 4 3 4 5 FD UW Set-Up UW FD Customer Customer 1
  • 17. Mortgage Application Process Improvement Results Metric Before After Time to process a loan 5 Days 1.5 Days Customer complaints 4/Loan 1/Loan WIP 60 Loans 25 Loans 17
  • 18. Building a Lean Enterprise
  • 19. Pull Systems A method of controlling the flow of work and/or material by replenishing work/material only as it is consumed Types   One-Piece Flow FIFO lanes (first-in-first-out)  Visual system authorizing supplier to send next “order”  Note: FIFO in and of itself is not a pull system  Kanban  Visual card system authorizing supplier to replenish stock/supplies/parts If flow stops at a single point (no consumption), everything upstream stops as well (no replenishment) 19
  • 20. Pull System Flow Diagram Closed loop Customer RFQ Verify In In Complete Completed Enter info. quote per Quote Box in QEF log Box Quote QEF Customer Information Request Document Flow WIP Locations © 2008 Karen Martin & Associates
  • 21. Pull Systems Concepts If a bottleneck occurs, everything upstream must stop! Resource re-allocation must occur.  Cross-trained workers are essential. Highlights problems and makes corrective action mandatory. © 2008 Karen Martin & Associates
  • 22. Pull System in Admin Processes Step A Step B Step C Step D Color coded folders or cards  quick status of WIP at each process step Maximum number of visual indicators between each process  full queue indicates resources must be re-diverted Monitor WIP at first process to estimate current throughput time © 2010 Karen Martin & Associates Step E
  • 23. Single Bin Kanban System Cardboard Divider Kanban Card Place card on top of parts immediately under divider (1) Appropriate Sized Bin (kanban quantity fits into one bin) (2) (3) Draw Line Inside Insert Cardboard Pan at Order Divider to Create Point Level Physical Barrier
  • 25. Tape Kanban Do not replenish Replenish
  • 26. Before / After Excessive inventory; Unclear who is responsible for management/replenishment Controlled inventory; Color-coding identifies who is responsible for management/replenishment 26
  • 27. Building a Lean Enterprise
  • 28. Creating a Lean Enterprise Eliminate muda – Waste Eliminate muri – Overburden (people or equipment) Eliminate mura – Uneveness 28
  • 29. Unbalanced Work 20 18 Takt Time Process Cycle Time 16 = 15 Min. 14 12 10 8 6 4 2 0 Order Entry Sales Review Design Estimating 29
  • 30. Takt Time Application German word being “pace” or “drumbeat” Used for balancing work and reducing bottlenecks (especially for high volume work) Best when workers are dedicated to one type of activity (even if for only a portion of the day)  Tough to use when workers are multi-tasked Will vary based on heavier or lower demand periods 30
  • 31. Takt Time Example: Continuous Production Available work time Takt time = Customer demand “Touch down” 480 minutes/day Takt time = 45 new accounts = 10.6 mins Each process step must have a process time of 10 minutes or less to avoid development of a backlog – OR more people to perform the task. 31
  • 32. Balanced Work Process Cycle Time 20 Takt Time = 15 Min. 15 10 5 0 Order Entry & Review Standard Design Complex Design Estimating 32
  • 33. Work Balancing Considerations  Avoid creating excessively narrow scopes of responsibility.  “Production line” vs. one-stop-shop    Assess “between work item” mental setup (switching) required – if redundant mental setup, consider one-stop-shop Assess “within work item” mental setup (switching) required – if too much, consider production line Assess skill requirements – can one person easily do it all?  Who’s job is it?  Be willing to challenge paradigms  Segment the work when necessary © 2010 Karen Martin & Associates 33
  • 34. Use Work Segmentation in High Variation Environments Segment work based on process time needed to complete the tasks (e.g. degree of complexity). Cross-train workers to do all levels of complexity. Rotate staff from team to team frequently to keep interest and skill level high.  Creates organizational flexibility © 2010 Karen Martin & Associates 34
  • 35. Task-level FTE Requirements Process Time # FTEs Required = 20 mins # FTEs = 10 mins Takt Time 2 FTEs required to = meet customer demand 35
  • 36. Creating a Lean Enterprise Eliminate muda – Waste Eliminate muri – Overburden (people or equipment) Eliminate mura – Uneveness 36
  • 37. Load Leveling Three product types: A, B, C Weekly customer demand: 12 A’s, 9 B’s, 3 C’s Traditional Production Model  AAAAAAAAAAAA—BBBBBBBBB—CCC Better  AAAA-BBB-C-AAAA-BBB-C-AAAA-BBB-C Best  ACABABAB ACABABAB ACABABAB © 2008 Karen Martin & Associates 37
  • 38. Production Smoothing (Heijunka) Leveling of: Volume of production  The same quantity is produced each “interval” for each product family Variety of production (product mix)  Every (high-volume) model is produced every “interval” © 2010 Karen Martin & Associates
  • 39. Load Leveling Tips  First seek the root cause!  When external customers are creating unlevel incoming load   We have much more influence over external customer behavior than we think. Incentives:  Information – e.g. add peak times to ACD phone recordings  Financial – provide discounts, etc. for making requests during certain time periods – e.g. sunset dinner specials  When sales team creates unlevel incoming load  Change commission period/schedule.  When internal department creates unlevel load, find out why and apply a countermeasure or incentive that works for all. © 2010 Karen Martin & Associates 39
  • 40. Prerequisites to Production Smoothing 1. 2. 3. 4. Connect the processes where possible (cells) Create pull Create flow (balance the work) Achieve predictability (level output produced daily for the cell or the line) 5. Reduce work type changeover time 6. Increase number of changeovers per day so can increase the number of each type of work produced per day © 2010 Karen Martin & Associates
  • 41. 41
  • 42. Heijunka for the Office 42
  • 43. 43
  • 45. Lean Management © 2010 Karen Martin & Associates 45
  • 46. Process Ownership & Value Stream Alignment  Value Stream Champion / Manager   Sole individual responsible for the performance of an entire value stream across multiple departments or divisions. Often carry P & L responsibility.  Process Owner  Sole individual responsible for the performance of a process across many functions, regardless of the org chart.  Ongoing monitoring  Ongoing improvement  Org chart management   Direct reporting lines for day-to-day operation Dotted lines to subject matter/policy expertise. © 2010 Karen Martin & Associates 46
  • 47. Creating Lean Leaders & Culture The improvement professional’s primary role is to sell and teach.  Many leaders aren’t improvement savvy.  Help them understand the process, the resources required, etc. – answer Why? Why? Why?  Many individuals have been “burned” by previous improvement approaches and are fearful in today’s economy.  Help them see what’s in it for them.  Most people – from leadership to frontlines – aren’t proficient problem solvers.  Teach them to fish. © 2010 Karen Martin & Associates 47
  • 48. Looking for Stuff: Time is Money Organization with 1,500 employees   Earn average of $22 per hour Work 250 days per year Each employee spends an average of 10 minutes per day looking or waiting for stuff  Individual impact  = 41.7 hours wasted time per year  = 0ver a week of frustrating, unfulfilling, nonproductive time  Organizational impact  = 62,550 hours of nonproductive time  30 FTEs worth of wasted resources  = $1.4 unnecessary direct expense per year © 2010 Karen Martin & Associates 48
  • 49. Translating Office/Service Improvements into Financial Terms (aka “Monetizing Results”) © 2010 Karen Martin & Associates 49
  • 50. Monetizing Results – Expense Reduction Possibilities  Payroll   Paid overtime Attrition (if flat or losing market share)  In-sourcing previously outsourced services  Supplies (one-time gain when implementing kanban)  Software licenses  Shipping expenses  Facility-related   Leases Utilities  Borrowing expenses (due to improved cash flow) © 2010 Karen Martin & Associates 50
  • 51. Monetizing Results – Cost Avoidance Possibilities Freed capacity / hiring expenses Turnover reduction / hiring expenses Regulatory fines Not scrapping nonreturnable material/supplies Not ordering duplicate material/supplies Not having to borrow money (due to improved cash flow) © 2010 Karen Martin & Associates 51
  • 52. Monetizing Results – Revenue Gains, Revenue Loss Avoidance, and Profit Gains Freed capacity   Ability to absorb additional work without additional labor or equipment New revenue streams Revenue gains   Shorter time to market Sales team fully functional more quickly Market share gains Retaining high risk (“jeopardy”) accounts © 2010 Karen Martin & Associates 52
  • 53. Monetizing Results – Revenue Loss Possibilities Reducing PT in T&M Environments  Overcome by market share gains & new revenue streams © 2010 Karen Martin & Associates 53
  • 54. For Further Questions 7770 Regents Road #635 San Diego, CA 92122 858.677.6799 ksm@ksmartin.com Free webinars and monthly newsletter: www.ksmartin.com/subscribe Connect with us: 54