SlideShare a Scribd company logo
1 of 26
Download to read offline
Value Stream Analysis:
Beyond the Mechanics (Part 3 of 3)

Webinar
February 18, 2014
Welcome!
•
•
•
•
•
•
•
•

Australia
Brazil
Botswana
Canada
Denmark
Egypt
Great Britain
Ireland

•
•
•
•
•
•
•
•

Lithuania
Malaysia
Netherlands
New Zealand
Russia
Saudi Arabia
Spain
United States

www.ksmartin.com/subscribe
© 2014 The Karen Martin Group, Inc.
 Coach / Facilitator / Consultant / Trainer: 
Lean transformation & business performance 
improvement in all industries.
 Teacher: University of California, San Diego
 Author & Speaker:
Karen Martin, President
The Karen Martin Group, Inc.
www.ksmartin.com

2013 Shingo 
Prize winner!

www.ksmartin.com/subscribe
3
Before the webinar…
• Materials:
– www.ksmartin.com/files/webinarmaterials/02‐18‐
2014_slides.pdf (or _handout.pdf)

After the webinar…
• Recordings:
–
–
–
–

www.ksmartin.com/webinars
www.vimeo.com/karenmartingroup
www.youtube.com/karenmartingroup
www.slideshare.net/karenmartingroup

• Materials:
– www.slideshare.net/karenmartingroup
© 2014 The Karen Martin Group, Inc.

4
More VSM Learning
• Next Webinar
– Thursday, March 27, 11:00 am – 12:15 pm PT
– Value Stream Mapping: Case Studies
– https://www2.gotomeeting.com/register/288652530

• Recorded webinars (including 5S Supply and iGrafx)
– www.ksmartin.com/webinars

• Podcasts
– www.ksmartin.com/media (Podcast tab)

• Public VSM workshops – SHS and AME conferences
– www.ksmartin.com/events

• In‐house VSM workshops & facilitated VSM activities
– Call us!
© 2014 The Karen Martin Group, Inc.

5
You will learn how to…
• Create & manage a value stream 
transformation plan.
• Apply PDSA to assure that you’re making the 
best improvements.
• Engage the entire workforce in making 
change.
• Measure your progress.

© 2014 The Karen Martin Group, Inc.

6
Basic Current State Value Stream Map: 
3 Sections
1

2

3

© 2014 The Karen Martin Group, Inc.

7
Basic Value Stream Map: Future State
1

Customer

IT interface
Standard
work

Error
proof

IT-1

Crosstrain

Modified
approvals
2

Process 1

3

Crosstrain

Process 2

Function A
1 items

IT-2

LT = 1 days
PT = 10 mins.
%C&A = 99%

Process 3

Function C
5 items

5

4

Standard
work

Function E
10 items

3
LT = 2 days
PT = 120 mins.
%C&A = 95%

4
LT = 0.5 days
PT = 30 mins.
%C&A = 95%

1 days

2 days

0.5 days

Total LT = 3.5 days

10 mins.

120 mins.

30 mins.

Total PT = 160 mins.
Activity Ratio = 9.5%
Rolled %C&A = 89.3%

© 2014 The Karen Martin Group, Inc.

8
Basic Value Stream
Future State Performance Metrics
Current State 

Projected
Future State 

Projected
% Improvement

9.5 days

3.5 days

63.2%

180 minutes

160 minutes

11.1%

Activity Ratio

3.9%

9.5%

143.6%

Rolled % Complete & 
Accurate

30.0%

89.3%

197.7%

Metric
Total Lead Time
Total Process Time

Other?
Other?

© 2014 The Karen Martin Group, Inc.

9
Value Stream Mapping:
Phases and Timing
Repeat

Prepare

4 Weeks Prior 
to Mapping

Understand 
Current State

Design
Future State

Develop 
Transformation 
Plan

Three Consecutive Days

Execute 
Transformation 
Plan

Following 
Mapping

10
Current State Value Stream Map
<Client>
CURRENT STATE Value Stream Map
(Product>
<Map assumptions>
Demand Rate = XXXX/ Year
February 03, 2014

Customer

SalesForce

2

1

Prepare
Proposal
450 items

3

4

Hand Over to
Proj Mgmt

Send PO or
LOI
7 items

150 items

Excel

9 items

Plan &
Schedule
Project

5

7 items

Review
Specs; scope
project.
Prepare initial
cust. docs

7

Customer

Sales
2 approvals

Project Mgmt

41 items

LT = 2 weeks
PT = 12 hrs .
%C&A = 2%

LT = 0 week s
PT = 16 hrs.
%C&A = 35%

10A

11A

12

13A

14

15A

17

LT = 6 week s
PT = 92 hrs.
%C&A = 0%

16

19 items

Customer

Release Long
LT Items to
Production

Release
Complete
Final Design

Issue Reqs
for Short
Lead Parts

21 items

3 items

Build for Test
Product
6 items

3 items

Test &
Disassemble
Product

4 items

Build for
Shipment
PRODUCT

20 items

Package &
Ship
Product &
Systems

50 items

Customer

3 items

Approve Final
Documents

Eng

Eng

Purchasing
Planning

Production

Production

Production

LT = 105 day s
PT = 360 hrs .
%C&A = 75%

LT = 2 weeks
% C&A = 5%

Invoice
Customer
(final)

Finalize
Customer
Documents

Review &
Approve Docs

Start
designing
project

LT = 1 y ears
%C&A = 5%

8A

6

Eng, Quality,
Planning

Sales
(~ 200 pp)

LT = 2 week s
PT = 2.5 day s
%C&A = 75%

MS Project

LT = 85 day s
PT = 144 mins .
%C&A = 25%

LT = 2 week s
PT = 3 hrs .
%C&A = 5%

LT = 4 week s
PT = 48 hrs .
%C&A = 95%

LT = 5 day s
PT = 14 hrs .
%C&A = 90%

LT = 3 days
PT = 18 hrs .
%C&A = 95%

Engineering
Quality

Logistics

Finance
LT = 6 months

120 items

6B

8B

0 items

Begin Create
Customer
Docs

Create
Demand;
Issue Reqs for
Long Lead
Items

X3

PM
Planning
Doc Control
ME

Engineering
Quality

9

10B

11B

LT = 4 week s
PT = 72 hrs.
%C&A = 99%

LT = 2 months
%C&A = 50%

13B

15B
3 items

Procure Long
Lead Items
3 items

Invoice
Customer

Test & Build
from Test
Systems

18 items

LT = 1 months
PT = 3 hrs .
%C&A = 95%

Build for
Shipment
SYSTEMS

Invoice
Customer
(Shipment)

3 items

Purchasing

Finance

LT = 2 week s
PT = 3 hrs .
%C&A = 5%

LT = 2 months
PT = 4 hrs .
%C&A = 5%

Production

Systems
Production

Finance
Logistics
PM

LT = 6 day s
PT = 44 hrs .
%C&A = 95%

LT = 1 days
PT = 8 hrs .
%C&A = 95%

LT = 30 day s
PT = 6 hrs .
%C&A = 95%

22 items

LT = 7 months
PT = 124 hrs.
%C&A = 0%

LT = 5 day s
PT = 8 hours
%C&A = 80%

6C

25 items

10C

Invoice
Customer
Supplier
Send Parts

Finance
LT = 7 months

LT = 4 weeks
PT = 2.5 hrs .
%C&A = 95%

10.0 days
0.5 weeks

10.0 days
50.4 weeks

0.3 weeks

30.0 days
0.4 weeks

147.0 days

105.0 days

85.0 days

10.0 days

42.0 days

20.0 days

5.0 days

3.0 days

20.0 days

2.3 weeks

3.1 weeks

9.0 weeks

0.1 weeks

0.1 weeks

0.1 weeks

1.2 weeks

0.3 weeks

0.5 weeks

1.8 weeks

21.0 days
8.4 weeks

25.2 weeks

Total LT = 930.0 days

0.1 weeks

Total PT = 103.7 weeks
Activity Ratio = 55.8%
Rolled %C&A = 0%
Future State Value Stream Map
3.Create v isual
timeline to educate
customers

7. Error proof P.O. info
(correct s pecs , s hip to, etc .);
notify c us tomer re mis sing info
and drop dead date

5. Soc ializ e new c riteria for
engineering, quality &
purc hasing involv ement

4. Define technic al info
Ebara needs from
customer and when

1. Create procedure/train GS s ervic e
engineers to properly feedbac k
suggestions to engineering

Customer

6. Rev is e s tandard Ts & Cs to
inc orporate time limit for c us tomer
approv al for final pay ment

2.Create bulletin re:
s tandardized headplate
des ign to eliminate flange
orientation.

1

13. Revis e proposal
template to limit time
to 4 revisions

9. Add initial
projec t releas e in
SF

16. Create trigger to
release (BOMs) for
purchas e.

10. Enforce customer
-reques ted CO
procedure

8. Create c riteria for
LOI ac ceptanc e

4A

Review PO

6A

Approve cust.
doc package

Customer

8

7A

Procure
items

PM

Stage order
(100% comp.)
Prod. Control
Hydrotest

Send
materials

Customer
Sales

25. Trans ition data
reduction to test engineer

5A

Plan &
Schedule
Project

26. Update data book
process to submit after test
reports received.

15. Create commodity
management team &
s upplier SLAs

18. Eliminate
Requisitions

3

Send PO or
LOI

LT = 10 day s
PT = 64 hours
%C&A = 95%

19. Analyz e/implement
c hange management
sy stem.

20. Create approved
s upplier program

2

Prepare
Proposals

Sales
Engineering
Quality
Purchasing

14. Standardiz e
WBS/QPR from
s uppliers

27. Pre-arrange
s hipping bas ed on
production sc hedule

9A

Build for
Test
(Product)

10

Test &
Disassemble
Product

Total PT = 16h

28. Create the means to
have a daily level-loaded
production sc hedule

(Includes Quality
Inspection)

11A

Build for
Shipment
(Product)

12

Package;
ready to ship
(including
docs)

13A

Invoice
Customer
(shipment)

Total PT=36h
Total PT=72h

Total PT=48h

Supplier
Purchasing

Warehouse

Production

Production

Logistics

Finance

LT = 3.1 day s
PT = 24 hrs.
%C&A = 99%

LT = 8 days
PT = 6 hrs.
%C&A = 95%

Production
LT = 1 y ears
%C&A = 75%

LT = 2 week s
LT = 8 hours
PT = 4 hrs.
%C&A = 95%

PT = 16 hrs .
%C&A = 90%

LT = 8 hours
PT = 6 hrs .
%C&A = 99%

21. Create
c onfigurator
(standard part)

12. Move to one
release (pump &
s ys tems )

Value
Stream
STOPS if
no PO

LT = 4 hours
PT = 2 hrs .
%C&A = 99%

LT = 1.1 day s
PT = 8 hrs .
%C&A = 95%

LT = 5 days
PT = 16 hrs.
%C&A = 95%

LT = 3 days
PT = 18 hrs.
%C&A = 95%

16. Create pull s ignal
for inv oicing.

4B

11. Create one-piec e
engineering flow

LT = 5 months
PT = 0 hrs .

Complete &
release
initial
customer
docs

5B

6B

Create
balance of
customer
docs

Invoice
Customer

X 1.5
Total PT=186h

7B

Invoice
customer
(major
materials)

9B

23. Automate
s hop order
release.

24. Eliminate witnes sed
tes ting of elec tric al feedthroughs onsite

Build for
Test
(Systems)

11B

Build for
Shipment
(Systems)

13B

12B

Approve
final
documents

Invoice
Customer
(docs)

Customer
22. Create
engineering tools

Eng (32 hrs)
Quality (4 hrs)

ENG
Quality

Finance

Production

Production

LT = 5 day s
PT = 22 hours
%C&A = 95%

LT = 1 days
PT = 8 hrs .
%C&A = 95%

Finance

Finance
LT = 30 day s

LT = 5 day s
PT = 36 hrs .
%C&A = 85%

LT = 2 day s
PT = 2.5 hrs.
%C&A = 95%

LT = 3 months
PT = 124 hrs.
%C&A = 80%

LT = 2 days
PT = 3 hours
%C&A = 95%

LT = 2 days
PT = 3 hrs .
%C&A = 95%

11C

5C

Build
Crates

Complete &
Release ENG
package BOM

Total PT=48h

Total PT=268h

Logistics

LT = 3 days
PT = 24 hours
%C&A = 99%

LT = 7 weeks
PT = 206 hrs .
%C&A = 85%

8 hrs.

5 days

35 days

8 hrs.

4 hrs.

36 hrs.

206 hrs.

6 hrs.

105 days

4 hrs.

1 days

5 days

3 days

3 days

Timeline LT = 160 days

2 hrs.

8 hrs.

16 hrs.

18 hrs.

24 hrs.

Timeline PT = 320 hrs.
Activity Ratio = 25.0%
Rolled %C&A = 21%
Total PT = XX
Improvements / Hypotheses
Improved quality of information upfront.
Removed handoffs.
Shifted roles & responsibilities in 4 work areas.
Added a proper cross‐functional kick‐off activity.
Merged work.
Re‐sequenced work.
Moved work in parallel.
Innovated re: design.
Created new work triggers.
Created one‐piece flow in engineering by 
reconfiguring staff and workloads.
• Rationalized suppliers (starting the process).
• Implementing a hard stop to work if no PO received.

•
•
•
•
•
•
•
•
•
•

© 2014 The Karen Martin Group, Inc.

13
Value Stream Performance Improvement
Projected Results
Current State 

Projected
Future State 

Projected
% Improvement

17 months

7.5 months

56%

Timeline Process Time

600 hours

450 hour

25%

Rolled % Complete & 
Accurate

0%

21%

> 2,000%

On‐time delivery

13%

90%

592%

25/project

12/project

52%

Metric
Timeline Lead Time
(RFQ to shipping)

# Internally‐produced 
Change Orders

© 2014 The Karen Martin Group, Inc.

14
PACE Prioritization chart

© 2014 The Karen Martin Group, Inc.

15
Prioritization Grid
Creating the Transformation Plan

16
Value Stream Transformation Plan
Value Stream
Executive Sponsor
Value Stream Champion
Value Stream Mapping Facilitator
Date Created
Kaizen
Burst #

4
5
6
7
8
9
10
11
12
13
14
15
16

Content removed for sanitization purposes

3

Jim McMahon

2/10 + bi-weekly Thu 10 am

Sally Brooks
Karen Martin
1/5/2014
Exec.
Method *

Owner

Create procedure/train GS service engineers to
properly feedback suggestions to engineering.

Improvement Objective / Hypothesis

1
2

Scheduled Review Dates

Product Y

PROJ

Create bulletin re: standardized headplate
design to eliminate flange orientation.

PROJ

Steve

Create visual "milestone" timeline to
educate customers.

KE

Bruce

Define technical info needed from
customer and when.

KE

Bruce

Socialize new criteria for engineering,
quality, & purchasing involvement.

PROJ

Jessie

Revise standard Ts & Cs to incorporate time limit
for customer approval for final payment.

PROJ

Sally

Error proof P.O. info (correct specs, ship to,
etc.); notify customer re missing info and
drop dead date.

KE

Jessie

PROJ

Mike

JDI

Jessie

Resocialize existing customer-requested
CO procedure.

PROJ

Steve

One piece engineering flow

PROJ

Steve

Move to one release (pump & systems)

PROJ

Bob

JDI

Jessie

Standardize WPS/PQR from suppliers.

PROJ

Marcia

Create commodity management team &
supplier SLAs.

PROJ

Tom

KE

Marcia

PROJ

Sally

Create criteria for LOI acceptance.
Add initial project release in SF.

Revise proposal template to limit time to 4
revisions.

Create trigger to release (BOMs) for
purchase.
Create pull signal for invoicing.

17

Planned Timeline for Execution

Steve

Proposed Countermeasure

J

F

M

A

M

J

J

A

S

O

N

D

Status

Agreement
Executive Sponsor

Value Stream Champion

Value Stream Mapping Facilitator

Signature:

Signature:

Signature:

Date:

Date:

Date:

* Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project)

17
Improvement Roles

Strategic

Who?

Accountability

Tool

Sr. Leaders

“What has to happen”

Hoshin Plan, A3, 
Value Stream 
Mapping

“How it will happen”

Kaizen Events, 
Just‐do‐its,    
and Projects

Tactical

Middle 
Management

Frontlines

© 2014 The Karen Martin Group, Inc.

18
Value Stream Mapping:
Phases and Timing
Repeat

Prepare

4 Weeks Prior 
to Mapping

Understand 
Current State

Design
Future State

Develop 
Transformation 
Plan

Three Consecutive Days

Execute 
Transformation 
Plan

Following 
Mapping

19
Key Success Factors
• Consistent Executive Sponsor involvement
– Run or attend status meetings

• Consistent status meetings
– At least monthly
– Every other week to start

• Single point of ownership
– But collaborative problem solving and obstacle 
removal.

• PDSA at every meeting
• Edit the future state map real time
• Adjust the transformation plan as needed
© 2014 The Karen Martin Group, Inc.

20
Develop
hypothesis

Refine
Standardize 
Stabilize

Conduct 
experiment

Measure 
results
© 2014 The Karen Martin Group, Inc.

21
21
Physically Post 
the Future State Map
Physically Post
the Transformation Plan
© 2014 The Karen Martin Group, Inc.

22
Value Stream Transformation Plan
Value Stream Product Y

Scheduled Review Dates

Executive Sponsor Jim McMahon

2/10 + bi-weekly Thu 10 am

Value Stream Champion Sally Brooks
Value Stream Mapping Facilitator Karen Martin
Date Created 1/5/2014
Kaizen
Burst #

Improvement Objective / Hypothesis

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Content removed for sanitization purposes

1

17

Planned Timeline for Execution

Exec.
Method *

Owner

Create procedure/train GS service engineers to
properly feedback suggestions to engineering.

PROJ

Steve

0%

Create bulletin re: standardized headplate
design to eliminate flange orientation.

PROJ

Steve

100%

Create visual "milestone" timeline to
educate customers.

KE

Bruce

50%

Define technical info needed from
customer and when.

KE

Bruce

50%

Socialize new criteria for engineering,
quality, & purchasing involvement.

PROJ

Jessie

100%

Revise standard Ts & Cs to incorporate time limit
for customer approval for final payment.

PROJ

Sally

100%

Error proof P.O. info (correct specs, ship to,
etc.); notify customer re missing info and
drop dead date.

KE

Jessie

0%

PROJ

Mike

100%

JDI

Jessie

50%

Resocialize existing customer-requested
CO procedure.

PROJ

Steve

80%

One piece engineering flow

PROJ

Steve

10%

Move to one release (pump & systems)

PROJ

Bob

0%

JDI

Jessie

100%

Standardize WPS/PQR from suppliers.

PROJ

Marcia

25%

Create commodity management team &
supplier SLAs.

PROJ

Tom

30%

KE

Marcia

50%

PROJ

Sally

50%

Proposed Countermeasure

Create criteria for LOI acceptance.
Add initial project release in SF.

Revise proposal template to limit time to 4
revisions.

Create trigger to release (BOMs) for
purchase.
Create pull signal for invoicing.

J

F

M

A

M

J

J

A

S

O

N

D

Agreement
Executive Sponsor

Value Stream Champion

Value Stream Mapping Facilitator

Signature:

Signature:

Signature:

Date:

Date:

Date:

* Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project)

Status
And Repeat…

© 2014 The Karen Martin Group, Inc.

24
“The new bible for value stream mapping.”
—Art Byrne, author, The Lean Turnaround

Amazon: www.bitly.com/VSMbk
More info: www.ksmartin.com/VSM
© 2014 The Karen Martin Group, Inc.

25
For Further Questions

Karen Martin, President
7770 Regents Road #635
San Diego, CA 92122
858.677.6799
ksm@ksmartin.com
Blog & newsletter:  www.ksmartin.com/subscribe

© 2014 The Karen Martin Group, Inc.

26
26

More Related Content

What's hot

Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3TKMG, Inc.
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...TKMG, Inc.
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InTKMG, Inc.
 
Metrics-Based Process Mapping: An Excel-Based Solution
Metrics-Based Process Mapping: An Excel-Based SolutionMetrics-Based Process Mapping: An Excel-Based Solution
Metrics-Based Process Mapping: An Excel-Based SolutionTKMG, Inc.
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingTKMG, Inc.
 
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)TKMG, Inc.
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping TKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Improvement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumImprovement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumTKMG, Inc.
 
New employee onboarding
New employee onboardingNew employee onboarding
New employee onboardingWilliam Chin
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 

What's hot (20)

Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive In
 
Metrics-Based Process Mapping: An Excel-Based Solution
Metrics-Based Process Mapping: An Excel-Based SolutionMetrics-Based Process Mapping: An Excel-Based Solution
Metrics-Based Process Mapping: An Excel-Based Solution
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
 
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and Service
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not people
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Impact of Agile on HR
Impact of Agile on HRImpact of Agile on HR
Impact of Agile on HR
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Improvement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumImprovement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open Forum
 
New employee onboarding
New employee onboardingNew employee onboarding
New employee onboarding
 
Lean Management System Assessment
Lean Management System AssessmentLean Management System Assessment
Lean Management System Assessment
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 

Viewers also liked

Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Achieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldAchieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldWilson Perumal and Company
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)TKMG, Inc.
 
PDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationPDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationWilson Perumal and Company
 
Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Michael Sahota
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowchartsSteven Bonacorsi
 
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Process Safety Culture
 
Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Wilson Perumal and Company
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsWilson Perumal and Company
 
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingKanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingMichael Sahota
 
Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Wilson Perumal and Company
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 
Measuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleMeasuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleFrank-G. Adler
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?Tina Arora
 
HR 2020 - The future of HR Practices
HR 2020 - The future of HR PracticesHR 2020 - The future of HR Practices
HR 2020 - The future of HR PracticesFarhan Muhammad
 

Viewers also liked (20)

End-to-End processes
End-to-End processesEnd-to-End processes
End-to-End processes
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Achieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldAchieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex world
 
Mapping the End to End Process
Mapping the End to End ProcessMapping the End to End Process
Mapping the End to End Process
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
 
PDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationPDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio Optimization
 
Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowcharts
 
Operational Excellence Roadmap
Operational Excellence RoadmapOperational Excellence Roadmap
Operational Excellence Roadmap
 
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
 
Presentación PDMA Mexico
Presentación PDMA MexicoPresentación PDMA Mexico
Presentación PDMA Mexico
 
Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
 
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingKanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
 
Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 
Measuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleMeasuremen Systems Analysis Training Module
Measuremen Systems Analysis Training Module
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
A New Perspective on Operational Excellence
A New Perspective on Operational ExcellenceA New Perspective on Operational Excellence
A New Perspective on Operational Excellence
 
HR 2020 - The future of HR Practices
HR 2020 - The future of HR PracticesHR 2020 - The future of HR Practices
HR 2020 - The future of HR Practices
 

Similar to Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transformation Plan)

SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalAndrew Si
 
TQMI project Updated
TQMI project UpdatedTQMI project Updated
TQMI project UpdatedGunjan Naik
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptxAbdul Azeem
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxParabakaranBalasubra1
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyMike Poland, CMRP
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTPraveen Pravin
 
Final presentation
Final presentationFinal presentation
Final presentationAmogh Hajare
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, betterHarold van Heeringen
 
Excelogic Consulting and Training | Our Experience
Excelogic Consulting and Training | Our ExperienceExcelogic Consulting and Training | Our Experience
Excelogic Consulting and Training | Our ExperiencePT Inti Logika Cipta
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by DesignBir Gujral PhD, MBA
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 

Similar to Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transformation Plan) (20)

SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-External
 
TQMI project Updated
TQMI project UpdatedTQMI project Updated
TQMI project Updated
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptx
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Project mgt lesson plan
Project mgt lesson planProject mgt lesson plan
Project mgt lesson plan
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Excelogic Consulting and Training | Our Experience
Excelogic Consulting and Training | Our ExperienceExcelogic Consulting and Training | Our Experience
Excelogic Consulting and Training | Our Experience
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by Design
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 

More from TKMG, Inc.

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - YouTKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerTKMG, Inc.
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI CultureTKMG, Inc.
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesTKMG, Inc.
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSATKMG, Inc.
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right QuestionsTKMG, Inc.
 

More from TKMG, Inc. (20)

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob Stoller
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI Culture
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom Lines
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSA
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right Questions
 

Recently uploaded

Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfShashank Mehta
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Features of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfFeatures of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfOne Monitar
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
How do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfHow do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfshubhamaapkikismat
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 

Recently uploaded (20)

Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Features of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfFeatures of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdf
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
How do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfHow do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdf
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 

Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transformation Plan)