North East Bicycle Corridor
Linking Communities
A Boroondara Bicycle Users Group proposal
The need - Bicycles are used more and more for transport in Melbourne. The Yarra,
Anniversary, and Darebin Creek Trails already exist but the current Yarra crossing
route across the narrow Fairfield Pipe Bridge is circuitous and steep.
The solution - A direct arterial shared path built from Chandler Highway where the
Darebin, Yarra, and Anniversary Trails converge through to Alexandra Parade*.
*This is an updated proposal of the route referred to in BBUG‟s original submission as the “Dights Fall Trail”.Version 1.0
Benefits
• Transport
• Safety
• Linking communities
• Journey savings
Page 22/04/2014 North East Bicycle Corridor
Safe separation, good gradient
Family friendlyPeninsula Link Trail shared bridge
Benefits
2/04/2014 North East Bicycle Corridor Page 3
• Health
• Family friendly
• Key destinations
• Route connections
• Favourable cost-benefit
Gardiners Creek Trail
Alexandra Parade median bike path
Map 21. Plan Melbourne
Riders from 8 to 80A shared trail
Planning considerations
• The NEBC will link with the new shared path along Alexandra Parade1
• Provide infrastructure to meet project performance requirement T1 (pedestrian and bicycle)
• Provide new cycling infrastructure connecting with Melbourne's northern and eastern suburbs2
• The NEBC route is included in Plan Melbourne, Initiative 3.1.5, Support Walking and Cycling in
Central Melbourne 3
• "Create safe environments for pedestrians and bicycle riders“ and "Incorporate pedestrian and
bicycle facilities when building other infrastructure“, Ministerial Statement4
• Support strategic directions in Cycling into the Future, Victoria‟s Cycling Strategy5 including:
– Reduce safety risks
– Encourage cycling
– Plan networks and prioritise investments
2/04/2014 North East Bicycle Corridor Page 4
1$100m plus boost for Melbourne‟s public transport - Premier of Victoria
2Walking and cycling - Linking Melbourne Authority
3Plan Melbourne, Metropolitan Planning Strategy, Victorian Government, Oct 2013. Page 80. Map 21.
4Walking, Riding and Access to Public Transport, Australian Government, Department of Infrastructure & Transport 2013, p11
5Cycling into the Future 2013-23, Victorian Government
Map 21. Plan Melbourne
More than 1 million Victorians ride a bike each week and
trips to work by bike have grown by 5 per cent each year
(2001-2011)5
Hospital and
University
Precinct
Current Network – Poor Connections
Very poor existing
connection
• Anniversary Trail
• Koonung Creek Trail
• Darebin Creek Trail
• Yarra Trail
Inner
suburbs
To:
No current direct
connections from:
Page 52/04/2014 North East Bicycle Corridor
CBD
Inner suburbs & CBD
Hospital and
University Precinct
Before: Existing route is unsafe, 1km longer
and takes approx. 10 minutes more to ride
Bicycle Route Before and After
After: NEBC direct route is shorter, safer and much easier to ride
Page 62/04/2014 North East Bicycle Corridor
Steps near Chandler Highway - 7 flights with 61 steps
Some Existing Route Issues
The existing route deters many cyclists,
particularly young and novice riders.
Narrow pipe bridge across the Yarra River
Narrow, steep and circuitous path with
numerous sharp unsafe bends
Page 72/04/2014 North East Bicycle Corridor
Long uphill grade on Kew Boulevard could be eliminated
NEBC Probable Catchment Area
The NEBC will service a catchment area population of 211,000 within 40
minutes riding from Alexandra Parade from suburbs including Fairfield,
Alphington, Kew, Ivanhoe, Bulleen, Balwyn, Hawthorn, North Balwyn, Mont
Albert North, Doncaster and Heidelberg
Page 82/04/2014 North East Bicycle Corridor
Source: 2011 Census
Route details from East to West
• Route starts from Yarra Trail east of Chandler Highway
• Under Chandler Highway and Off-Ramp
• From Off-Ramp towards Yarra River
• Yarra River Crossing
• Yarra River to Clifton Hill
• Merri Creek Crossing
• Under Clifton Hill Rail Line
• Through Hoddle Street Interchange
• Connect to Alexandra Parade Median shared path
2/04/2014 North East Bicycle Corridor Page 9
Chandler Highway - start
The starting point at the eastern end of the route leaves the existing
Yarra shared trail near the Guide Dogs, east of Chandler Hwy
Page 102/04/2014 North East Bicycle Corridor
Chandler Highway and Off-Ramp
Use unused underpass
under Chandler Highway
New underpass to be
constructed under east
bound Chandler
highway off-ramp
Page 112/04/2014 North East Bicycle Corridor
From Off-Ramp towards Yarra River
Bicycle route to be constructed
behind „New Jersey‟ traffic
barrier with screen above it to
minimise driver distraction,
noise and effect of wind gusts.
Route will require earthworks
to toe of batter and a small
retaining wall
Page 122/04/2014 North East Bicycle Corridor
Yarra River Crossing
Preferred treatment: Repurpose existing lanes
• Existing left freeway lane becomes freeway emergency lane
• Existing emergency lane becomes NEBC route bridge
crossing behind New Jersey barrier
Page 132/04/2014 North East Bicycle Corridor
Yarra River Crossing – Alternatives
Alternative 1. No emergency stopping lane over bridge
Alternative 2. Separate bike bridge over Yarra
Page 142/04/2014 North East Bicycle Corridor
Proposed bicycle route is outside the freeway reservation, passing
the Fairfield Fly Fishing Ponds and recreational ovals
Yarra River to Clifton Hill
Page 152/04/2014 North East Bicycle Corridor
Looking East from Parks Vic Office
Merri Creek Crossing
West of Groom St the route is located off-
road between Alexandra Parade East with
the sound barriers placed closer to the
flyover piers.
Page 162/04/2014 North East Bicycle Corridor
Under Clifton Hill Rail Line
Regrade route to provide a
minimum clearance of 2.2 metres
under Clifton Hill Rail bridge
Page 172/04/2014 North East Bicycle Corridor
Through Hoddle Street Interchange
Switchback on bicycle bridge
Page 182/04/2014 North East Bicycle Corridor
* Off-road route is preferable
Tunnel portal
On-road bicycle route*
Concept alignment of bicycle
bridge through interchange
Bicycle route along
Alexandra Parade median
Alexandra
Parade
Off-road shared path
Hoddle Street Interchange
Conceptual height of bicycle bridge
through Hoddle Street Interchange –
designed to minimise the gradient
Page 192/04/2014 North East Bicycle Corridor
• Road flyover approx. 17m
height above ground to clear
the Clifton Hill rail line.
• Road flyover clearance to
Hoddle Street approx. 12m
• Indicative NEBC bike bridge is
shown underneath road flyover,
with 6m clearance of Hoddle
Street
East West Link Model illustrating NEBC route crossing Hoddle St
Connect to Alexandra Parade Median
The western end of the NEBC route
connects with the shared path on the
Alexandra Parade median
Page 202/04/2014 North East Bicycle Corridor
This will provide good
access to the inner suburbs
of Collingwood, Abbotsford,
Fitzroy, Carlton, Richmond,
Parkville and the CBD.
Cost Estimate
• A concept cost estimate of the North East Bicycle Corridor has
been prepared based on indicative plans for the East West Link
released by Linking Melbourne Authority.
• The estimated cost is $30 million to construct NEBC works from
Chandler Highway to Alexandra Parade (Wellington Street). The
estimate includes provision for contingencies of 50%
• The NEBC project would cost considerably more if it were
constructed following the completion of the East West Link.
• Thus, the opportunity to construct this valuable bicycle project
should not be deferred.
Page 212/04/2014 North East Bicycle Corridor
Approaching Hoddle St
Interchange looking east
2/04/2014 North East Bicycle Corridor Page 22
Visual concept only, design engineering has not been done. Source: Urban Circus
Switchback below Road Flyover
2/04/2014 North East Bicycle Corridor Page 23
Visual concept only, design engineering has not been done. Source: Urban Circus
Crossing Hoddle St looking East
2/04/2014 North East Bicycle Corridor Page 24
Visual concept only, design engineering has not been done. Source: Urban Circus
Looking East to Hoddle Street
2/04/2014 North East Bicycle Corridor Page 25
Visual concept only, design engineering has not been done. Source: Urban Circus
Descending to Alexandra
Parade Median
2/04/2014 North East Bicycle Corridor Page 26
4.
Visual concept only, design engineering has not been done. Source: Urban Circus
Summary
• There is an opportunity to build the NEBC and provide greatly
needed cycling infrastructure and meet project performance
requirement T1 (pedestrian and bicycle).
• The NEBC will provide:
– significant benefits to the community including local bicycle and pedestrian trips,
connecting communities and workplaces and longer transport-oriented cycling
trips servicing large catchment areas.
– a direct off-road route offering a shorter and quicker journey
– a much safer alternative to on-road routes that will encourage the use of bicycles
as a transport mode
– a very cost effective transport solution compared to road and rail if done in
conjunction with the EW Link
• The NEBC route is both practical and feasible – detailed planning
will resolve design and construction details.
• The NEBC will contribute significantly to the community amenity of
the EW Link project.
Page 272/04/2014 North East Bicycle Corridor
Recommendation
The Boroondara Bicycle Users Group requests that the
Assessment Panel recommend the construction of the North
East Bicycle Corridor as part of the East West Link Project
Page 282/04/2014 North East Bicycle Corridor
Bicycle bridge on Peninsula Link Trail Ted Smout Memorial Bridge, Brisbane
References
• North East Bicycle Corridor, Boroondara BUG
– http://boroondarabug.org/wiki/M3
• Eastern Corridor Trail, Bicycle Network
– https://www.bicyclenetwork.com.au/general/better-conditions/975/
• North East Bicycle Corridor, Victorian Cycling Network
– http://www.victorian-cycling-network.org/bicycle-routes/north-east-bicycle-corridor
2/04/2014 North East Bicycle Corridor Page 29

More Related Content

What's hot

LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLeslie Blaser
 
Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Campus Services
 
Developing a Regional Bike Sharing Program
Developing a Regional Bike Sharing ProgramDeveloping a Regional Bike Sharing Program
Developing a Regional Bike Sharing ProgramHarvard Campus Services
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardJustin Lyons
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for CyclistsCycling Scotland
 
MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)Cycling Scotland
 
FortOrdTrailsSymposium_Background-RegionalContext_021915
FortOrdTrailsSymposium_Background-RegionalContext_021915FortOrdTrailsSymposium_Background-RegionalContext_021915
FortOrdTrailsSymposium_Background-RegionalContext_021915Josh Metz
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingCity of College Station
 
Walking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyWalking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyCity of College Station
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesign South East
 
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...Todd Boulanger
 
Bikes and buses
Bikes and busesBikes and buses
Bikes and busesJohn Luton
 
Complete Streets Report
Complete Streets ReportComplete Streets Report
Complete Streets Reportjadamsm
 
Roadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsRoadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsDesign South East
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forumchapinspencer
 

What's hot (20)

LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction Update
 
Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014
 
Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
 
Bike Plan Presentation Planning Commission
Bike Plan Presentation   Planning CommissionBike Plan Presentation   Planning Commission
Bike Plan Presentation Planning Commission
 
Developing a Regional Bike Sharing Program
Developing a Regional Bike Sharing ProgramDeveloping a Regional Bike Sharing Program
Developing a Regional Bike Sharing Program
 
Bike Rack Requirements
Bike Rack RequirementsBike Rack Requirements
Bike Rack Requirements
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists
 
MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)
 
FortOrdTrailsSymposium_Background-RegionalContext_021915
FortOrdTrailsSymposium_Background-RegionalContext_021915FortOrdTrailsSymposium_Background-RegionalContext_021915
FortOrdTrailsSymposium_Background-RegionalContext_021915
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
 
Walking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and SafetyWalking in College Station – Development Standards and Safety
Walking in College Station – Development Standards and Safety
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian Lord
 
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...
2015.06.10 Urbane Streets - Ridgefield - Multimodal Network Tech - Memo 1 Exi...
 
Bikes and buses
Bikes and busesBikes and buses
Bikes and buses
 
Complete Streets Report
Complete Streets ReportComplete Streets Report
Complete Streets Report
 
Roadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsRoadspace Allocation for Better Streets
Roadspace Allocation for Better Streets
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
 
Lick Creek Hike & Bike Trail
Lick Creek Hike & Bike TrailLick Creek Hike & Bike Trail
Lick Creek Hike & Bike Trail
 

Viewers also liked

Our Low Carbon Future Community Consultation Nov 2011 draft
Our Low Carbon Future Community Consultation Nov 2011 draftOur Low Carbon Future Community Consultation Nov 2011 draft
Our Low Carbon Future Community Consultation Nov 2011 draftGreenlivingpedia
 
Hawthorn to box hill trail
Hawthorn to box hill trailHawthorn to box hill trail
Hawthorn to box hill trailGreenlivingpedia
 
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011Greenlivingpedia
 
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80Greenlivingpedia
 
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50Greenlivingpedia
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your BusinessBarry Feldman
 

Viewers also liked (7)

Our Low Carbon Future Community Consultation Nov 2011 draft
Our Low Carbon Future Community Consultation Nov 2011 draftOur Low Carbon Future Community Consultation Nov 2011 draft
Our Low Carbon Future Community Consultation Nov 2011 draft
 
Hawthorn to box hill trail
Hawthorn to box hill trailHawthorn to box hill trail
Hawthorn to box hill trail
 
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
 
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
 
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
 
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job? Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
 

Similar to North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade

Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventDesign South East
 
Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)Nick Andrew
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Projectcityofevanston
 
AMETI project information board
AMETI project information boardAMETI project information board
AMETI project information boardAuckland Transport
 
Bicycle friendly traffic lights
Bicycle friendly traffic lightsBicycle friendly traffic lights
Bicycle friendly traffic lightsBilly Hudson
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Thomas Downs
 
Revolutionise roundabout design
Revolutionise roundabout designRevolutionise roundabout design
Revolutionise roundabout designJumpingJaq
 
International Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesInternational Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesDesign South East
 
The 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment PanelThe 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment PanelChris Goodman
 
Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2Trailnet
 
Metro to Mosaic Bikeway
Metro to Mosaic BikewayMetro to Mosaic Bikeway
Metro to Mosaic BikewayFairfax County
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonTrailnet
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCrowdbrite
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...hisimp
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Fairfax County
 

Similar to North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade (20)

Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
AMETI project information board
AMETI project information boardAMETI project information board
AMETI project information board
 
2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett
 
Bicycle friendly traffic lights
Bicycle friendly traffic lightsBicycle friendly traffic lights
Bicycle friendly traffic lights
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Revolutionise roundabout design
Revolutionise roundabout designRevolutionise roundabout design
Revolutionise roundabout design
 
International Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesInternational Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil Jones
 
The 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment PanelThe 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment Panel
 
Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2
 
Metro to Mosaic Bikeway
Metro to Mosaic BikewayMetro to Mosaic Bikeway
Metro to Mosaic Bikeway
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 

Recently uploaded

Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 

Recently uploaded (9)

Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 

North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade

  • 1. North East Bicycle Corridor Linking Communities A Boroondara Bicycle Users Group proposal The need - Bicycles are used more and more for transport in Melbourne. The Yarra, Anniversary, and Darebin Creek Trails already exist but the current Yarra crossing route across the narrow Fairfield Pipe Bridge is circuitous and steep. The solution - A direct arterial shared path built from Chandler Highway where the Darebin, Yarra, and Anniversary Trails converge through to Alexandra Parade*. *This is an updated proposal of the route referred to in BBUG‟s original submission as the “Dights Fall Trail”.Version 1.0
  • 2. Benefits • Transport • Safety • Linking communities • Journey savings Page 22/04/2014 North East Bicycle Corridor Safe separation, good gradient Family friendlyPeninsula Link Trail shared bridge
  • 3. Benefits 2/04/2014 North East Bicycle Corridor Page 3 • Health • Family friendly • Key destinations • Route connections • Favourable cost-benefit Gardiners Creek Trail Alexandra Parade median bike path Map 21. Plan Melbourne Riders from 8 to 80A shared trail
  • 4. Planning considerations • The NEBC will link with the new shared path along Alexandra Parade1 • Provide infrastructure to meet project performance requirement T1 (pedestrian and bicycle) • Provide new cycling infrastructure connecting with Melbourne's northern and eastern suburbs2 • The NEBC route is included in Plan Melbourne, Initiative 3.1.5, Support Walking and Cycling in Central Melbourne 3 • "Create safe environments for pedestrians and bicycle riders“ and "Incorporate pedestrian and bicycle facilities when building other infrastructure“, Ministerial Statement4 • Support strategic directions in Cycling into the Future, Victoria‟s Cycling Strategy5 including: – Reduce safety risks – Encourage cycling – Plan networks and prioritise investments 2/04/2014 North East Bicycle Corridor Page 4 1$100m plus boost for Melbourne‟s public transport - Premier of Victoria 2Walking and cycling - Linking Melbourne Authority 3Plan Melbourne, Metropolitan Planning Strategy, Victorian Government, Oct 2013. Page 80. Map 21. 4Walking, Riding and Access to Public Transport, Australian Government, Department of Infrastructure & Transport 2013, p11 5Cycling into the Future 2013-23, Victorian Government Map 21. Plan Melbourne More than 1 million Victorians ride a bike each week and trips to work by bike have grown by 5 per cent each year (2001-2011)5
  • 5. Hospital and University Precinct Current Network – Poor Connections Very poor existing connection • Anniversary Trail • Koonung Creek Trail • Darebin Creek Trail • Yarra Trail Inner suburbs To: No current direct connections from: Page 52/04/2014 North East Bicycle Corridor CBD Inner suburbs & CBD Hospital and University Precinct
  • 6. Before: Existing route is unsafe, 1km longer and takes approx. 10 minutes more to ride Bicycle Route Before and After After: NEBC direct route is shorter, safer and much easier to ride Page 62/04/2014 North East Bicycle Corridor
  • 7. Steps near Chandler Highway - 7 flights with 61 steps Some Existing Route Issues The existing route deters many cyclists, particularly young and novice riders. Narrow pipe bridge across the Yarra River Narrow, steep and circuitous path with numerous sharp unsafe bends Page 72/04/2014 North East Bicycle Corridor Long uphill grade on Kew Boulevard could be eliminated
  • 8. NEBC Probable Catchment Area The NEBC will service a catchment area population of 211,000 within 40 minutes riding from Alexandra Parade from suburbs including Fairfield, Alphington, Kew, Ivanhoe, Bulleen, Balwyn, Hawthorn, North Balwyn, Mont Albert North, Doncaster and Heidelberg Page 82/04/2014 North East Bicycle Corridor Source: 2011 Census
  • 9. Route details from East to West • Route starts from Yarra Trail east of Chandler Highway • Under Chandler Highway and Off-Ramp • From Off-Ramp towards Yarra River • Yarra River Crossing • Yarra River to Clifton Hill • Merri Creek Crossing • Under Clifton Hill Rail Line • Through Hoddle Street Interchange • Connect to Alexandra Parade Median shared path 2/04/2014 North East Bicycle Corridor Page 9
  • 10. Chandler Highway - start The starting point at the eastern end of the route leaves the existing Yarra shared trail near the Guide Dogs, east of Chandler Hwy Page 102/04/2014 North East Bicycle Corridor
  • 11. Chandler Highway and Off-Ramp Use unused underpass under Chandler Highway New underpass to be constructed under east bound Chandler highway off-ramp Page 112/04/2014 North East Bicycle Corridor
  • 12. From Off-Ramp towards Yarra River Bicycle route to be constructed behind „New Jersey‟ traffic barrier with screen above it to minimise driver distraction, noise and effect of wind gusts. Route will require earthworks to toe of batter and a small retaining wall Page 122/04/2014 North East Bicycle Corridor
  • 13. Yarra River Crossing Preferred treatment: Repurpose existing lanes • Existing left freeway lane becomes freeway emergency lane • Existing emergency lane becomes NEBC route bridge crossing behind New Jersey barrier Page 132/04/2014 North East Bicycle Corridor
  • 14. Yarra River Crossing – Alternatives Alternative 1. No emergency stopping lane over bridge Alternative 2. Separate bike bridge over Yarra Page 142/04/2014 North East Bicycle Corridor
  • 15. Proposed bicycle route is outside the freeway reservation, passing the Fairfield Fly Fishing Ponds and recreational ovals Yarra River to Clifton Hill Page 152/04/2014 North East Bicycle Corridor Looking East from Parks Vic Office
  • 16. Merri Creek Crossing West of Groom St the route is located off- road between Alexandra Parade East with the sound barriers placed closer to the flyover piers. Page 162/04/2014 North East Bicycle Corridor
  • 17. Under Clifton Hill Rail Line Regrade route to provide a minimum clearance of 2.2 metres under Clifton Hill Rail bridge Page 172/04/2014 North East Bicycle Corridor
  • 18. Through Hoddle Street Interchange Switchback on bicycle bridge Page 182/04/2014 North East Bicycle Corridor * Off-road route is preferable Tunnel portal On-road bicycle route* Concept alignment of bicycle bridge through interchange Bicycle route along Alexandra Parade median Alexandra Parade Off-road shared path
  • 19. Hoddle Street Interchange Conceptual height of bicycle bridge through Hoddle Street Interchange – designed to minimise the gradient Page 192/04/2014 North East Bicycle Corridor • Road flyover approx. 17m height above ground to clear the Clifton Hill rail line. • Road flyover clearance to Hoddle Street approx. 12m • Indicative NEBC bike bridge is shown underneath road flyover, with 6m clearance of Hoddle Street East West Link Model illustrating NEBC route crossing Hoddle St
  • 20. Connect to Alexandra Parade Median The western end of the NEBC route connects with the shared path on the Alexandra Parade median Page 202/04/2014 North East Bicycle Corridor This will provide good access to the inner suburbs of Collingwood, Abbotsford, Fitzroy, Carlton, Richmond, Parkville and the CBD.
  • 21. Cost Estimate • A concept cost estimate of the North East Bicycle Corridor has been prepared based on indicative plans for the East West Link released by Linking Melbourne Authority. • The estimated cost is $30 million to construct NEBC works from Chandler Highway to Alexandra Parade (Wellington Street). The estimate includes provision for contingencies of 50% • The NEBC project would cost considerably more if it were constructed following the completion of the East West Link. • Thus, the opportunity to construct this valuable bicycle project should not be deferred. Page 212/04/2014 North East Bicycle Corridor
  • 22. Approaching Hoddle St Interchange looking east 2/04/2014 North East Bicycle Corridor Page 22 Visual concept only, design engineering has not been done. Source: Urban Circus
  • 23. Switchback below Road Flyover 2/04/2014 North East Bicycle Corridor Page 23 Visual concept only, design engineering has not been done. Source: Urban Circus
  • 24. Crossing Hoddle St looking East 2/04/2014 North East Bicycle Corridor Page 24 Visual concept only, design engineering has not been done. Source: Urban Circus
  • 25. Looking East to Hoddle Street 2/04/2014 North East Bicycle Corridor Page 25 Visual concept only, design engineering has not been done. Source: Urban Circus
  • 26. Descending to Alexandra Parade Median 2/04/2014 North East Bicycle Corridor Page 26 4. Visual concept only, design engineering has not been done. Source: Urban Circus
  • 27. Summary • There is an opportunity to build the NEBC and provide greatly needed cycling infrastructure and meet project performance requirement T1 (pedestrian and bicycle). • The NEBC will provide: – significant benefits to the community including local bicycle and pedestrian trips, connecting communities and workplaces and longer transport-oriented cycling trips servicing large catchment areas. – a direct off-road route offering a shorter and quicker journey – a much safer alternative to on-road routes that will encourage the use of bicycles as a transport mode – a very cost effective transport solution compared to road and rail if done in conjunction with the EW Link • The NEBC route is both practical and feasible – detailed planning will resolve design and construction details. • The NEBC will contribute significantly to the community amenity of the EW Link project. Page 272/04/2014 North East Bicycle Corridor
  • 28. Recommendation The Boroondara Bicycle Users Group requests that the Assessment Panel recommend the construction of the North East Bicycle Corridor as part of the East West Link Project Page 282/04/2014 North East Bicycle Corridor Bicycle bridge on Peninsula Link Trail Ted Smout Memorial Bridge, Brisbane
  • 29. References • North East Bicycle Corridor, Boroondara BUG – http://boroondarabug.org/wiki/M3 • Eastern Corridor Trail, Bicycle Network – https://www.bicyclenetwork.com.au/general/better-conditions/975/ • North East Bicycle Corridor, Victorian Cycling Network – http://www.victorian-cycling-network.org/bicycle-routes/north-east-bicycle-corridor 2/04/2014 North East Bicycle Corridor Page 29