This presentation was conducted by DOE back in July 2009. The deck details the approval process Lynas went through to receive approvals for the construction of LAMP.
Lynas malaysia public communication july 13 2009 doe presentation
1. PUBLIC BRIEFING ON
LYNAS LANTHANIDES PROJECT
PRESENTER :
PUAN AZURI AZIZAH BT. HJ. SAEDON
DEPARTMENT OF ENVIRONMENT PAHANG
TINGKAT 4, BANGUNAN ASIA LIFE
JALAN TELUK SISEK
25662 KUANTAN
2. Department of Environment
Ministry of Natural Resources
and Environment
Other government Department of Other government
agencies Environment (DOE) agencies
1975 - Environment Division
1983 - Department of Environment (DOE)
-2-
3. Roles of Department of Environment (DOE)
To administer and enforce the Environmental Quality
Act, 1974 :
Prevention, abatement and control of pollution and
enhancement of the environment
There are 34 subsidiary legislations under the Act
-3-
4. Lynas must comply to the following Act &
Regulations
Environmental Quality Act 1974 :
Environmental Impact Assessment (EIA) report
Quantitative Risk Assessment (QRA) report
Guidelines for Prevention and Control of Soil Erosion and
Siltation in Malaysia , October 1996.
Environmental Quality (Sewage, and Industrial Effluents)
Regulations, 1979
Environmental Quality (Clean Air) Regulations,1978
Environmental Quality (Scheduled Wastes) Regulations, 2005
Planning Guidelines for Environmental Noise Limit and Controls,
2004
-4-
5. Conditions of Approval for Lynas
EIA and QRA prepared by registered environmental consultant
Proper and designated drainage system for the Residue Storage
Facilities (RSF)
Safety and Emergency control
AELB’s approval on monitoring, management and disposal of
radioactive containing materials
Chemical and scheduled waste management
Solid waste management
Environmental management plan (EMP)
Control and monitoring of :
Air quality - soil condition - Noise
Water quality including underground water
-5-
6. Requirements that Lynas must comply and monitored
by DOE
Suspended solid less than 100 mg/l from the silt trap discharge
during construction
Water quality monitoring report on 30 parameters upstream and
downstream of Sungai Balok
4 borewells for underground water quality monitoring
Ambient Air Quality monitoring of parameters CO2, CO, NO2, NO,
SO2, HF, H2SO4, PM10, and TSP
Noise monitoring at four (4) stations
Discharge effluent quality report from the final discharge point
Stack emission sampling to comply Standard C, Clean Air
Regulations, 1978 and AELB’s standards.
Compliance report
Environment audit report
-6-
7. Lynas Project : AIR
How will Lynas ensure its Air Emissions meet DOE requirements?
Lynas will install waste gas treatment systems for the removal
of sulfuric acid and sulfur dioxide
It is a five-stage waste gas scrubbing system
Lynas also has an emergency scrubbing system to ensure air
emission meet DOE requirements at all times
Air Quality Modelling has been completed
-7-
8. Lynas Project : WATER
How will Lynas ensure its Industrial Effluents meet DOE requirements?
Lynas will install a 2-stage waste water treatment system
High Density Sludge Neutralization
to neutralize acids and remove metals
Industrial effluent treatment system (IETS),
an activated sludge bio-treatment
To treat process water to reduce BOD and COD
IE discharges to comply to Standard B of Regulation 8(1)(b),
Environmental Quality (Sewage, and Industrial Effluents) Regulations,
1979 and AELB’s standards
Lynas will install an independent storm water system
To ensure Storm water will not be contaminated by process water
Waste water from the Water Leached Process is recycled back
to the process.
-8-
9. Conclusion
DOE approved the Lynas Project after a detailed review of the
EIA and QRA submitted by Environ in Jan 2008. Approval was
granted with conditions in Feb 2008.
DOE separately approve the detailed design of key pollution
control equipment prior to installation, and for the Lynas
Project this includes the waste water treatment plant and the
waste gas treatment plant.
After EMP approval on Dec 2008, three site visits have been
conducted by DOE; construction works complied to EIA
conditions.
DOE, as the regulator, will ensure that Lynas operates
consistent with the act and regulations so that the impact to
the environment is minimised.
-9-